Water Utilities

Water Utilities

temp info

our projects

Performance
Outlet water requirements

(EVRAZ Group)​ upgrading of the chemical water treatment unit / 2007

Steam and Air Blowing Station Thermal Power Plant​ Consolidated West Siberian Metallurgical Plant

2007 Chemical Water Treatment Unit Upgrade at the Steam and Air Blowers Station (Capacity of 1,000 m3/h). The existing demineralization unit was characterized by a high chemical use. The project included addition of the new filter housings and an upgrade of the treatment process which provided significant savings due to reduction in chemical consumption.

2020 Feasibility Study and Pilot Testing of stormwater polishing process was conducted to meet regulatory effluent water quality parameters.


Process
  • Dyclar Counter-current Ion Exchange with Washing Device
Capacity
  • 1,000 m3/h
Services
  • Turnkey Project
  • Budget Development & Tracking
  • Design Development
  • Equipment Supply & Installation
  • Startup & Commissioning

Steam and Air Blowing Station Thermal Power Plant​ Consolidated West Siberian Metallurgical Plant

Water treatment for the public hot water supply / 2017

MARI PULP AND PAPER PLANT - THERMAL POWER PLANT

The project included water treatment unit retrofit with implementation of DYCLAR process for hot water treatment. The treated hot water is then supplied to the public.

Process
  • DYCLAR Dynamic Clarification
Capacity
  • 80 m³/h
Services
  • Filtering Clarifiers Retrofit into Dyclar Technology
  • Design Development
  • Equipment Supply
  • Project Oversight
  • Startup & Commissioning